Project Overview: This project involves the comprehensive electrical and plumbing works (first-fix and finishing) for 37 residential buildings affiliated with the Ministry of Housing, comprising a total of 814 modern apartments. Utilizing an advanced aluminum formwork system with monolithic concrete casting, all MEP installations were executed with high precision prior to pouring, ensuring high structural quality and efficient project delivery.
Construction Methodology & Technical Highlights
The project was constructed using an advanced Aluminum Formwork System, where walls and slabs were poured simultaneously in a monolithic casting process. This required precision in the MEP first-fix stage:
Pre-Pour MEP Installation: All conduit pipes, electrical back boxes, and plumbing sleeves were fully installed and secured prior to concrete casting.
Specialized Fixing & Levelling: MEP elements were securely fixed to specialized wire spacers rather than the rebar, precisely levelled to remain perfectly flush with the wall surface after stripping the formwork panels.
Turnkey Finishing: Complete final MEP finishes and fixtures were delivered in full compliance with the highest housing quality standards and engineering specifications.